Home
Products
Helium extraction
Wellhead Treatment
NGL Recovery Unit
Natural Gas Conditioning
Tail Gas Treatment Skid
Evaporation Crystallization Skid
Desulphurization Skid
Dehydration Skid
Decarbonization Skid
LNG Liquefaction Plant
Hydrogen Production Unit
Gas Generator set
Crude oil treatment equipment
News
About us
Contact us
Home
Products
Helium extraction
Wellhead Treatment
NGL Recovery Unit
Natural Gas Conditioning
Tail Gas Treatment Skid
Evaporation Crystallization Skid
Desulphurization Skid
Dehydration Skid
Decarbonization Skid
LNG Liquefaction Plant
Hydrogen Production Unit
Gas Generator set
Crude oil treatment equipment
News
About us
Contact us
Home
News
The deacidification and sulfur recovery plant produced by Rongteng were successfully ignited and put into trial operation (2)
2024-08-19 10:43
The amine process is applicable when natural gas contains a small amount of H2S and a high CO2/H2S ratio, but the CO2 content is not very high and does not require deep CO2 removal. This approach can ...
The deacidification and sulfur recovery plant produced by Rongteng were successfully ignited and put into trial operation (1)
2024-08-19 00:00
The Zhouwan Purification Plant is the final project for the construction of the northern production capacity in the Yan'an gas field of Yan'an Petroleum Group, with an annual capacity of 15 billion cu...
Advantages Of Iron Oxide Desulfurization Technology
2024-08-08 14:02
Natural gas processing is the process of removing water vapor, hydrogen sulfide, mercaptan, and carbon dioxide from natural gas. The main equipment includes dehydration unit, desulfurization unit, dec...
Iron oxide process description for removing acid gas from natural gas
2024-08-08 13:12
First, use desulfurization tower A. After running for a period of time, if the test results of sample 2 are close to the design value, it means that the tower packing is saturated and has lost its des...
Questions and answers of our gas generator set product (2)
2024-07-28 20:32
Generally, a 50000 cubic meter/day LNG plant is equipped with 1.5MW-2MW; Configure 4MW for 100000 cubic meters/day , 8MW for liquefying LNG plant 200000 cubic meters, and 12MW for 300000 cubic meters/...